- Capacity
- 2 medium rigid turns per hour
- Limits
- 3.4m clearance, 7m bay, no tailgate overhang
- Readiness dependency
- Marshal required above 70% load
Site onboarding
Enter assets, paths, constraints, and readiness rules.
Admins can define the operating model that booking will use: capacity assets, movement paths, release constraints, rollout surfaces, and tenant-specific defaults.
Site profile intake
Admin-entered site setup.
Enter the operating assumptions that booking will use later: site identity, default path, readiness model, and rollout state. Saved capacity assets feed the booking availability model.
- Capacity assets
- 4
- Path nodes
- 6
- Readiness gates
- 4
- Rollout links
- 3
Generated setup preview
Northbank Tower
Dock A -> Goods Lift 2 -> Basement ramp is the default tenant path. The setup model keeps asset capacity, path handoffs, and readiness rules in one operational configuration.
- Code
- NBT-SYD
- Rollout
- Internal setup
- Readiness
- Capacity first, readiness before release
Capacity assets
Asset limits drive slot recommendations.
- Capacity
- 1 small rigid or van turn per hour
- Limits
- Street queue cap: 2 vehicles
- Readiness dependency
- Security confirms street hold before release
- Capacity
- 45 minute hold with 10 minute buffer
- Limits
- 2.4m x 1.6m x 2.2m, blanket required
- Readiness dependency
- Lift booking locks when COI and crew count pass
- Capacity
- 1 active check-in, 1 standby
- Limits
- No staging before booked window
- Readiness dependency
- Driver mobile and rego required for SMS release
Path graph
Every booking moves through explicit handoffs.
- 01Street holdQueue buffer
No early arrival before T-15
Security confirms vehicle - 02Forecourt GateReadiness gate
Release only when driver, rego, and COI pass
Gate sends arrival event - 03Dock ACapacity asset
One active unload per bay
Marshal starts path - 04Goods Lift 2Vertical hold
Lift buffer attaches to path booking
Tenant floor contact confirms access - 05Basement rampMovement path
No lobby crossing, no noisy works after 15:00
Installer clears freight - 06CloseoutException check
No-show and overstay require reason code
Manager closes path
Readiness rules
Release controls stay configurable.
Any booking with external crew
Gate SMS stays blocked until certificate is validWindow starts before 07:00 or after 18:00
Booking enters Awaiting Approval with SLA timerDock load exceeds 70% or two active paths overlap
Marshal asset becomes required path dependencyDriver mobile or rego missing at T-60
Tenant gets readiness hold and reminderRollout surfaces
Each audience gets a setup link.
Shows booking rules, approved paths, and required documents
Collects vehicle, freight profile, crew, COI, and driver mobile
Shows live arrivals, path readiness, overstay, and no-show states
Customization controls
Site rules are visible before live writes.
Furniture and joinery paths expand to 60m when lift load is high
Late requests stay possible but use exception approval
Tenants can request exceptions; managers own final capacity decisions
Readiness holds suppress gate release until missing fields pass